King St. Reconstruction
- Full reconstruction of a 1.5 km stretch of King St., from Lindsay St. N to St. David St., rebuilt from the ground up.
- Replacement of aging watermain, storm, and sanitary sewers, including residential service connections and upgraded storm capacity discharging to the adjacent Trent Canal.
- A full temporary watermain installed and commissioned, so residents had uninterrupted potable water for the entire duration of construction.
- New curbs, sidewalks, asphalt, and line marking, plus traffic calming to slow traffic near the municipal trail system and Parks Canada Lock #33.