Site preparation across a 38,000 m² footprint, including tree clearing, mulching, stripping, and grubbing to ready the land for construction.
More than 120,000 m³ of bulk excavation, backfill, and engineered fill placed and compacted to bring the site to design grade.
Roughly 19,000 m² of new access roads and laydown areas, giving crews and equipment reliable movement across the site.
Comprehensive environmental protection, including ground matting to preserve land pending archaeological assessment, erosion and sediment controls, dewatering, drainage systems, and rip rap and gabion bank protection.